Help Center
  • FAQ
    browse most common questions
  • Live Chat
    talk with our online service
  • Email
    contact your dedicated sales:
  • Call Us
    9:00 - 18:00, Mon.- Fri. (GMT+8)
0

5 BOM Obsolescence Management Tips

Published on 4/23/2017 6:42:56 AM

Description

<style>.e_editor{font:14px/24px Roboto,Helvetica,Tahoma,Arial,'Microsoft YaHei','b8bf53';}.e_editor div,e_editor p,e_editor td,e_editor th,e_editor li{font-weight:inherit;font-size:inherit;font-style:inherit;font-family:inherit;}.e_editor ul{margin:-10px 0 20px;}.e_editor li{padding:5px 0;}.e_table{width:96%;border-collapse:collapse;empty-cells:show;}.e_table th,.e_table td{padding:5px;border:2px solid #eee;}.e_img{padding:10px 0;text-align:center;}.e_p{line-height:20px;padding:0 0 20px;text-indent:0em;}</style> <div class="e_editor"> <div class="e_p"> In today’smarket, it can often feel like parts become obsolete the second after they are designed in. It is important to carefully analyze your Bill of Materials (BOM), and discover any obsolescence risks within your assembly, before it becomes a problem. Through this 5 step process, you can properly check your BOM and identify high risk components before they become a problem in your manufacturing. </div> <div class="e_p"> <strong>Step 1: Break Down the Bill of Materials</strong> </div> <!--more-->The first step is breaking your BOM down into organized and manageable sections, ideally to its lowest and most specific component level. This means you should be able to look at each individual component within your BOM and be able to analyze each component separately. At this stage you can typically filter out custom parts like sheet metal and cable assemblies, common hardware, and phantom items (work instructions, etc.). <div class="e_p"> <strong>Step 2: Filter Out Obvious Low Risk Components</strong> </div> <div class="e_p"> After appropriately breaking down your BOM, it is time to filter out any obvious low risk components. Since the next step (Risk Analysis) will be the most time consuming part of this process, it’s necessary that you filter out the low risk components prior to beginning your analysis. Any components that you can buy off the shelf or have a 7+ years till end of production life should be filtered out. </div> <div class="e_p"> <strong>Step 3: Assess Obsolescence Risk for the Remain Components</strong> </div> <div class="e_p"> Now that you are ready to begin the risk analysis procedure, you can break the analysis process into two specific areas of study, <strong>probability of obsolescence</strong> and <strong>operational impact criticality</strong>. </div> <div class="e_p"> <ol> <li> <strong>Probability of Obsolescence:</strong> Consider the EAU for the PCB, and compares it to the consumption rate of the component. Additionally, the number of manufacturers available for the component, as well as the number of years left in the components lifetime, should be reviewed. </li> <li> <strong>Operational Impact Criticality:</strong> Addresses obsolescence issues on the system’s functionality and performance levels. When properly analyzed, it should give you an idea of the potential loss of availability. </li> </ol> </div> <!-- end HubSpot Call-to-Action Code --> <div class="e_p"> Utilization of SiliconExpert’s Risk Analysis tools will similarly allow you to look at the lifecycle risk of each component, as well as its potential inventory risk. This tool can prove invaluable in allowing you to understand the potential for obsolescence of every component utilized on your assembly. </div> <div class="e_p"> <strong>Step 4: Mitigation Decision and Component Prioritization</strong> </div> <div class="e_p"> Once you have calculated both the probability of obsolescence and the critical operational impact, you can then look at your obsolescence risk. Based on these two factors, each component can be segregated into one of the four categories below. </div> <div class="e_p"> The components within your filtered BOM can then be ranked and should be managed accordingly. </div> <div class="e_p"> <strong>∙Very High:</strong> Mitigation strategies should be implemented <strong>IMMEDIATELY</strong> to reduce obsolescence issues as soon as possible. Possible mitigation strategies include component replacement, planned system upgrades, and redesign considerations. </div> <div class="e_p"> <strong>∙High:</strong> Components should be addressed at your discretion. Additional research should also be done to look for solutions should the component become more of a threat in the future. </div> <div class="e_p"> <strong>∙Medium:</strong> Component should receive continued monitoring, and any serious obsolescence issues can be addressed on an as-needed basis. </div> <div class="e_p"> <strong>∙Low:</strong> Implementing a mitigation strategy is unnecessary and too costly to address at this stage. </div> <div class="e_p"> <strong>Step 5: Repeat Process Every 6 Months</strong> </div> <div class="e_p"> It is important to readdress and reanalyze your BOM every six months while the assembly is in production, to ensure continued component effectiveness. By continuously re-evaluating your components, you can ensure minimal obsolescence risk within your manufacturing, and promote continued efficiency and profitability. </div> </div>

11

comment

All comments

Unknown

5410

0

11

Go to Order My Own PCB

Rules about cashback: 1. Valid time: ALLPCB cashback activity will end on April 1st. 2. Capped amount: The capped amount of cashback for each account is $5,000. Each order can get a maximum of $2,000 cashback. That means every author can get $5,000 max. 3. Cashback range: The cashback activity only covers the corresponding PCB order. The order amount for other combined payment products will be invalid. 4. Clicking your own promotional link will be invalid. The same email address, shipping address, contact information, and phone number are all recognized as the same account. 5. ALLPCB has the final interpretation right of the cashback activity.

ALLPCB will donate 2% to the author for this promotion link.

Other Projects

Home / Industrial Automation low Cost with Arduino an ESP01

2458

0

314

Alternate Text josemarjr