Inquire about contract manufacturing costing

Inquire about contract manufacturing costing author avatar

2/28/2017 3:26:57 AM

Hi Guys,
Just would like to inquire about contract manufacturing costing:
a) if I send my bds. to a CM with a line of 2 chipshooter and 1 IC mounter and will use only 1 chipshooter and the ic placer for my product, do they need to charge me with the utilisation of 1 of the chipshooter when they r using it for theit product? Does the cost of placement need only to be calculated for the 2 machines they are using?
b) Id like to get Ideas on how a CM charge per component placement or per PCB and the average rate available in the market mainly in US.
c) Also when they say their line is capable of placing 55,000 CPH, how did they come to this and how do they come up to that if they have 3 machines per line.
Thanks and regards
Reply avatar
Giovanni Romanelli avatar

Giovanni Romanelli

3/2/2017 3:26:57 AM

Awesome post. Like it very much.

wolffdp avatar

wolffdp

3/2/2017 3:26:57 AM

I like checking your post and hope your update comes soon.

Alessio Galliazzo avatar

Alessio Galliazzo

3/2/2017 3:26:57 AM

Very impressive posting. Thank you for your efforts.

n0xas avatar

n0xas

3/2/2017 3:26:57 AM

You did a great job. Really appreciate your content.

Christever Rosario avatar

Christever Rosario

3/2/2017 3:26:57 AM

Quite useful and impressive info.Thanks for marvelous posting.

You might like
Dave avatar

Dave

  • Threads

    5

  • Following

    0

  • Followers

    0

PCB Prototype

PCB Prototype

PCB Instant Quote

x mm

Quantity

Quote Now

PCB Assembly

PCB Assembly

SMT-Stencil

SMT Stencil
Like Back to top