Purpose and Requirements of Automatic Reclosers

Author : Adrian September 25, 2025

Function of automatic reclosers

Advantages

  • 1. Greatly improve power supply reliability and reduce outage frequency, especially effective for single-source power systems
  • 2. Using reclosers on high-voltage lines can improve the stability of parallel operation in the power system
  • 3. Can correct mistrips caused by breaker mechanical faults or protection misoperations

Disadvantages

  • 1. Reclosing into a permanent fault may subject the power system to a secondary impact
  • 2. Degrades breaker operating conditions

5.3.3 Single-phase adaptive reclosing

Conventional recloser drawback:

Conventional reclosers attempt reclosing regardless of fault type (permanent or transient). If the fault is permanent, reclosing operations may cause a secondary impact on the system and equipment.

Single-phase adaptive reclosing:

Decide whether to reclose based on fault type: reclose if the fault is transient; do not reclose if the fault is permanent.

The key to implementing adaptive reclosing is how to distinguish between permanent and transient faults.

Basic principles for implementing comprehensive automatic reclosing

For a single-phase-to-ground short circuit, trip the single phase first, then attempt single-phase reclose; if the reclose is unsuccessful, trip all three phases and do not attempt reclose again.

For phase-to-phase short circuits, trip all three phases first, then attempt three-phase reclose; if the reclose is unsuccessful, trip all three phases and do not attempt reclose.

When a phase-selection element refuses to operate, the system should be able to trip all three phases and perform a three-phase reclose.

Protections that may misoperate during non-full-phase operation should be reliably blocked. For phase-to-phase protections that may misoperate during single-phase-to-ground faults (such as distance protection), measures should be in place to prevent inadvertent tripping of all three phases.

If one phase has tripped and the recloser refuses to operate, to prevent prolonged non-full-phase operation the other two phases should be automatically disconnected.

Basic principles for implementing comprehensive automatic reclosing

If relays for separation of any two phases operate, they should also cause the third phase to trip so that the three-phase breaker opens.

Whether for single-phase or three-phase reclosing, if reclosing is unsuccessful, measures should be considered to accelerate clearing of all three phases, i.e., implement post-reclose acceleration.

During non-full-phase operation, if another single- or two-phase fault occurs, protection should selectively clear it. If such a fault occurs before the single-phase reclose pulse is issued, then after the fault is cleared a three-phase reclose may be attempted. If it occurs after the reclose pulse has been issued, then after clearing the fault trip all three phases without attempting reclose.

For air circuit breakers or oil circuit breakers with hydraulic operation, when air or hydraulic pressure drops below the value required to perform reclosing, the reclose circuit should be automatically locked out. However, if pressure falls below the operating value during a reclose operation, completion of the reclose operation should be ensured.

Recommended Reading
Firestopping Requirements for Cable Trays and Wall/Slab Penetrations

Firestopping Requirements for Cable Trays and Wall/Slab Penetrations

September 26, 2025

Technical guide to firestopping cable tray and slab penetrations in electrical shafts; specifies materials, packing limits, waterstop heights and installation sequence.

Article
Two Automation Modes for Central Control Stations

Two Automation Modes for Central Control Stations

September 26, 2025

Technical overview of central control station for unmanned substations: compares hierarchical management mode and centralized control mode, with SCADA/dispatch integration.

Article
Optimal Location for Low-Voltage Power Factor Panels

Optimal Location for Low-Voltage Power Factor Panels

September 26, 2025

Comparison of PFC cabinet installation upstream vs downstream in a distribution room, assessing through-busbar capacity, ambient temperature impact, and correction effectiveness.

Article
Breaker Categories and 10/350, 8/20 Surge Parameters

Breaker Categories and 10/350, 8/20 Surge Parameters

September 25, 2025

Technical overview of breakers (CAT A/B), RCBO/RCCB/RCD, surge protector waveforms (10/350, 8/20), IP ratings for switchgear, and transformer hum causes and mitigation.

Article
Power Room Shutdown and Re-energization Sequence

Power Room Shutdown and Re-energization Sequence

September 25, 2025

Step-by-step shutdown and re-energization procedures for distribution switchgear, specifying low-voltage vs high-voltage isolation order, circuit breaker operations and fault recovery.

Article
Responding to High-Power Outages in Outdoor Construction

Responding to High-Power Outages in Outdoor Construction

September 25, 2025

Review of portable power options and large-capacity mobile energy stations for prolonged, high-power outages: specifications, output, cycle life, safety, and deployment.

Article